Three-bedroom house refurbishment in Sandy Bury, Orpington
A whole-house refurb, done and dusted in eight weeks.

- Project
- Whole-house refurbishment
- Location
- Sandy Bury, BR6
- Build time
- 8 weeks
- Structure
- One steel beam
The job
We took off an old rear conservatory and refurbished the whole three-bedroom house, opening up the ground floor into an open-plan diner. That meant removing one load-bearing wall on a steel beam designed by our structural engineer, and taking out the chimney breast.
Included
- Complete rewire, new plumbing and heating
- All plastering
- New skirting, architrave and internal doors
- White gloss kitchen with cork worktop
- 18mm engineered oak flooring over underfloor heating
- New decking and a new driveway
Project photos
More projects
Refurbishment · West WickhamFull house refurbishment on West Wickham Road
An interior designer who knew exactly what she wanted, and needed a builder who would build it exactly that way.
See the project →
Refurbishment · South East LondonThree-bedroom house refurbishment at Lea Green
A Victorian terrace brought back to life in eight weeks, keeping the period features that made it worth buying.
See the project →
Refurbishment · South LondonFull remodel of a four-bedroom house on The Avenue
Every floor, from the kitchen to the loft, reworked in 16 weeks.
See the project →
Planning a similar project?
Tell us a bit about the job and Baz will give you a ring to arrange a visit. There’s no charge for the survey and no pressure afterwards. You’ll get a fixed-price, itemised written quote, so you know exactly where you stand.
- Call or text07786 254637
- Emailinfo@smileybuildingservices.co.uk
- Opening hoursMon–Fri 8am–6pm, Sat 9am–1pm