Full remodel of a four-bedroom house on The Avenue
Every floor, from the kitchen to the loft, reworked in 16 weeks.

- Project
- Whole-house remodel
- Location
- The Avenue
- Build time
- 16 weeks
- Structure
- Two steel beams
The job
The owners wanted the house reorganised around a big open-plan diner. To get there we removed two load-bearing walls and the chimney breast, with two new steel beams specified by our structural engineer.
Included
- Full rewire, new plumbing and heating, and a 300-litre hot water system
- Modern white gloss slab kitchen with solid oak worktops
- Family bathroom with freestanding bath and porcelain tiles
- Original floorboards sanded
- New skirting, architrave and internal doors, new carpets in the bedrooms
- New patio and driveway outside
Project photos
More projects
Refurbishment · West WickhamFull house refurbishment on West Wickham Road
An interior designer who knew exactly what she wanted, and needed a builder who would build it exactly that way.
See the project →
Refurbishment · Orpington BR6Three-bedroom house refurbishment in Sandy Bury, Orpington
A whole-house refurb, done and dusted in eight weeks.
See the project →
Refurbishment · South East LondonThree-bedroom house refurbishment at Lea Green
A Victorian terrace brought back to life in eight weeks, keeping the period features that made it worth buying.
See the project →
Planning a similar project?
Tell us a bit about the job and Baz will give you a ring to arrange a visit. There’s no charge for the survey and no pressure afterwards. You’ll get a fixed-price, itemised written quote, so you know exactly where you stand.
- Call or text07786 254637
- Emailinfo@smileybuildingservices.co.uk
- Opening hoursMon–Fri 8am–6pm, Sat 9am–1pm






